Cuatro Villas Water System


This project was entirely 12” fusible PVC pipe near Espanola, NM. It consisted of about 6 miles of installed pipe, all “pulled” via special equipment so as not to disturb the existing pavement except as needed to install hydrants and valves. The project included an upgraded storage facility and a small pump station. NM-H2O assisted with construction management/quality control through the engineer, Souder Miller & Associates.